LJ Construction, Last update Til Sept 2014

5/23 From the City:

The concrete on Avenida De La Playa has passed the City's pressure test and the street has been opened.
The concrete driveways at 2110 and 2120 Avenida De La Playa will need to cure through the weekend. The La Jolla Beach and Tennis Club has extended parking privileges to the residents of those addresses through Memorial Day.
The Avenida De La Playa Infrastructure Replacement Project will stand down through Labor Day. Construction on Avenida De La Playa in the business district will resume in September. During the summer, at a date to be announced, the Project Team will meet with the business community to discuss the work that will take place.
On Tuesday, May 27, construction activity for Group Job 809 will shift to the east of La Jolla Shores Drive on Vallecitos, Avenida De La Playa and Paseo Dorado.

Last edited by Sdspeed; 05-23-2014 at 06:54 PM.
Sdspeed is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -8. The time now is 05:44 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
© 2002 Big Water's Edge. All rights reserved.