The barriers will be moved closer to the beach but access to drive onto the beach will not be allowed until at least Monday. The footing needs a longer time to cure. This info came from the city street division concrete supervisor.
It is likely to be open to foot traffic sooner. Kelvin
__________________
save some for tomorrow www.lajollafishing.com |
03-29-2010, 06:11 PM | #3 |
Senior Member
Join Date: Jul 2007
Location: San Pedro
Posts: 999
|
some say it takes 27 days for concrete to "cure"
hope they don't use that as the rule
__________________
|
03-29-2010, 09:37 PM | #4 |
Senior Member
Join Date: Sep 2006
Location: Bay Ho
Posts: 1,382
|
A Full Cure is 56 days.
That is the point that concrete reaches its maximum PSI rating according to Vulcan Materials. I had some dealings with their company senior engineer. Lets just hope for next week. |
03-29-2010, 10:53 PM | #5 |
Senior Member
Join Date: Mar 2009
Posts: 2,384
|
The original signage stated April 2. It was not open today.
|