View Single Post
Old 06-15-2010, 11:57 AM   #15
old_rookie
Senior Member
 
old_rookie's Avatar
 
Join Date: Mar 2010
Location: Santee
Posts: 904
Part of the it is finished with drywall. But I have no problem cutting holes in it. So far I cut two openings to get to the support joists. I'll be screwing in hooks to hang 55lbs pulleys (two, one at each end of the kayak) to run rope through and lift the kayak. Then install two rope anchors to tie off the two ropes.
old_rookie is offline   Reply With Quote